Having already received the accuracy and efficiency benefits of previous PCX installs, adopting another system enables VCMF to ensure that it continues to mitigate the risk of over-excavation and costly reworks as its fleet expands.
Prolec specified and tailored the system to VCMF’s needs, enabling it to implement seamlessly with the company’s pre-existing GPS solution and machine configuration.
Although the delivery of VCMF’s new excavator was delayed due to challenges associated with COVID-19, the team were able to recover their customer’s timeframe by taking every possible step to accelerate the system’s commissioning, while also solving any possible obstacles to its successful deployment.
For added assurance, Prolec’s 24/7 service line remains on hand to support the maritime and river works specialist going forwards. Operated by the team's expert engineers, this provides a responsive source of technical assistance should the need arise.
If you’d like to improve the precision of your underwater operations and reduce the cost of repeated surveys, grade checking and reworks, leave your details below and one of our team will be in touch.